United Utilities, Chester

Installation, Test & Commission Case Study

SITE

United Utilities, Chester

SERVICE PROVIDED

Installation, Test & Commission

SCOPE OF WORKS

Project installation of new Air-cooled Transformer

WHAT THE CLIENT WANTED

Our scope of work included de-commissioning of an existing oil cooled transformer and replace it with a new air-cooled transformer whilst re-using the existing LV cables to reconnect the new transformer once in position.
Project installation of new Air-cooled Transformer

What We Did

After several pre-start meetings and site visits with our nominated lift and shift and civils contractor we agreed a start date with our client which saw the start of the decommissioning of the old oil cooled transformer. INDSS manipulated the HV system to allow the second oil cooled transformer on site to take the load of the site whilst our work was being undertaken.

 INDSS instructed our nominated civils contractor to create temporary oil bunds around both oil cooled transformers whilst we undertook the removal of the existing brick bund. Our work involved hand digging to locate the existing HV cable which ran under landscaped ground soil from the HV substation to the transformer room. Once this cable was carefully exposed, we were able to safely disconnect the existing cable from both the HV substation and the transformer, we were then able to install new cable to accommodate and suit the needs of the new air cooled transformer.

INDSS instructed our nominated lift and shift contractor to complete the contract lift for us which included crane lifting the old transformer out onto a flatbed truck and then crane lifting the new transformer into the transformer room whilst undertaking careful manoeuvring. Upon final place positioning INDSS commenced with the connection of the HV and LV cables into the new air-cooled transformer. Once the transformer was successfully commissioned into service our nominated civils contractor returned to site to remove the temporary bund and build a new brick bund around the remaining oil cooled transformer.

This project was completed over a 2-week period and was successfully handed back to the client within the agreed timescales.

support

Project Achievements

  • All installation works completed within client timescales, within budget and without incidents
  • Careful planning and co-ordination with client to ensure a smooth installation
  • Project planning with both lift and shift and civils
  • Installation and commissioning of new Transformer
  • Installation of all high and low voltage cabling including terminating
Project installation of new Air-cooled Transformer
Project installation of new Air-cooled Transformer
Project installation of new Air-cooled Transformer

INDSS Ltd are one of the UK’s leading independent substation contractors
specialising in high voltage engineering

CASE STUDIES

Please click on the links below to see some of our recent projects.

 

Powertrain, Milton Keynes

Turnkey Project HV Supply

Powertrain, Milton Keynes

Full Transformer maintenance including removal of foliage

HV TRANSFORMER MAINTENANCE

Bray Studios, Windsor Case Study

Emergency Call Out service

Installation, Test & Commission

CANARY RIVERSIDE PLAZA HOTEL CASE STUDY

Full Annual HV Maintenance

Full Annual HV Maintenance

VARIOUS ANAEROBIC DIGESTION SITES

HIGH AND LOW VOLTAGE SERVICES

Independent Substation Services Ltd

Unit 31 Edison Road,
Rabans Lane,
Aylesbury
Buckinghamshire
HP19 8TE.

Email Us

Call Us

01296 434 808