Cable Jointing / Cable Terminations Case Study

SITE

Tunnelling Project London

SERVICE PROVIDED

Cable Jointing / Cable Terminations

SCOPE OF WORKS

Termination of 33KV and 11KV HV Cables

WHAT THE CLIENT WANTED

Our scope of work on the site was to connect several satellite packaged substations to the main incoming substation whilst undertaking a variety of HV cable terminations into various HV equipment such as Ring Main Units and Circuit Breakers. 

TUNNELLING PROJECT, LONDON

 

What We Did

Our HV Jointers are fully trained and competent to undertake many different types and makes of terminations and joints that may be used in our industry.  This site used mainly 3 core and single core XLPE IXSU type termination kits onto the 11KV and 33KV cables.  We also had a variety of separable connector (T-boot) type terminations to complete on site.

Cables were dressed, glanded and cleated into position by our team on site before being terminated into the equipment.  We offered our client full VLF testing or DC pressure testing of the cable upon completion of all terminations and joints.  To have this variety of skill in our team makes us able to take a project from cable pull to final testing – and all done in house with our direct employees.  This gives us complete control on the safety of our team at work as well as the quality of our workmanship.

We have delivered every satellite substation on time keeping the client and project team happy with our work on site.

support

Project Achievements

  • All installation works completed within client timescales, within budget and without incidents
  • Supply and installation of all terminations from 11KV to 33KV
  • Supply and installation of a variety of materials – ensuring that we had the correct materials and skills to undertake the installation on the various different equipment on site
  • Production of a high standard of workmanship on all terminations and joints
  • Planning works according to client needs and project goals
TUNNELLING PROJECT, LONDON
TUNNELLING PROJECT, LONDON
TUNNELLING PROJECT, LONDON

INDSS Ltd are one of the UK’s leading independent substation contractors
specialising in high voltage engineering

CASE STUDIES

Please click on the links below to see some of our recent projects.

 

Powertrain, Milton Keynes

Turnkey Project HV Supply

Powertrain, Milton Keynes

Full Transformer maintenance including removal of foliage

HV TRANSFORMER MAINTENANCE

Bray Studios, Windsor Case Study

Emergency Call Out service

Installation, Test & Commission

CANARY RIVERSIDE PLAZA HOTEL CASE STUDY

Full Annual HV Maintenance

Full Annual HV Maintenance

VARIOUS ANAEROBIC DIGESTION SITES

HIGH AND LOW VOLTAGE SERVICES

Independent Substation Services Ltd

Unit 31 Edison Road,
Rabans Lane,
Aylesbury
Buckinghamshire
HP19 8TE.

Email Us

Call Us

01296 434 808