HV Transformer Maintenance Case Study
SITE
SERVICE PROVIDED
SCOPE OF WORKS
DESIGN, INSTALLATION, TEST & COMMISSION
WHAT THE CLIENT WANTED
What We Did
After an initial site inspection, INDSS drafted a works programme which included for removal of the foliage whilst essential supplies to the site were maintained. Upon approval from our client, INDSS commenced work with removal of heavy foliage around the transformer, whilst taking care to preserve all wildlife.
Once the area was clear and free from any obstructions, INDSS commenced with maintaining the transformer including replacing a perished silica gel breather.
This project was completed was completed in one day, within budget and without any incidents on site.
Project Achievements
- All maintenance completed within client timescales, within budget and without incidents
- Careful planning and co-ordination with site supervisors to ensure minimal disruption
- Continued Annual maintenance to ensure equipment is kept in good working order
- Continual communication to ensure smooth maintenance
- Preservation of wildlife
INDSS Ltd are one of the UK’s leading independent substation contractors
specialising in high voltage engineering
CASE STUDIES
Please click on the links below to see some of our recent projects.
Turnkey Project HV Supply
Powertrain, Milton Keynes
HV TRANSFORMER MAINTENANCE
Bray Studios, Windsor Case Study
Installation, Test & Commission
CANARY RIVERSIDE PLAZA HOTEL CASE STUDY
Cable Jointing / Cable Terminations
TUNNELLING PROJECT, LONDON
Project installation of new Air-cooled Transformer
United Utilities, Chester
Black building testing including full HV/LV maintenance
Carmelite House, London
Installation, Test & Commission
MERSEY TUNNEL
Full Annual HV Maintenance
VARIOUS ANAEROBIC DIGESTION SITES
HIGH AND LOW VOLTAGE SERVICES
Independent Substation Services Ltd
Unit 31 Edison Road,
Rabans Lane,
Aylesbury
Buckinghamshire
HP19 8TE.
Email Us
Call Us
01296 434 808